Props List
No additional props were used when photographing the participating models.

Costume List
No additional costumes were worn when photographing the participating models; standard clothing was used, worn upon entry and exit of the studio.

Location Report
The location used for all photography is as follows:
Room W16, West Block
East Norfolk Sixth Form College
Gorleston, Great Yarmouth
Norfolk, England
NR31 7BQ

Contacts
The following contacts are all participating models:


Production Schedule
This schedule shows the production process in which the front cover, contents page and double page spread (DPS) with article were created. (Note that the tense is set in the past.)

Week 1: The production began with the fundamental designs to the front cover, contents and DPS being made. Potential participants for the photoshoot were consulted in this week and the following responses were received: Ashleigh, Peter and Toni accepted, and I also considered participating.

Week 2: The photoshoot with Ashleigh, Peter, Toni and myself in W16 at ENSFC took place; other potential participants were offered the opportunity prior to the photoshoot but were either unable to attend or declined it.

Week 3: Additional tweaks to the front cover, contents and DPS were made; discussions around its production took place between myself and my tutor to see what needed to be done and where elements could be improved. A second photoshoot was then considered with Emily, but confirmation was needed before anything took place.

Week 4: The second photoshoot with Emily in W16 at ENSFC took place as she agreed to participate; the best photos were chosen for the front cover and DPS afterwards and further tweaks to all products were made.

Week 5: In the final working week before Christmas, the DPS was completed along with its article, while the front cover and contents were still in progress. Concern arose around the use of colours on the contents page, and this was not resolved in the week.

Week 6: Returning from the Christmas holidays, work continued on the products and tweaks were made to the design of the front cover; a draft of it was printed out for evaluation and corrections.

Week 7: At last, the front cover was completed after the major overhaul following the draft evaluation from the previous week; the contents page was also completed after minor tweaks and checks were applied and the colour use dispute was put to rest.

Week 8: All products were completed and printed out for procession and marking. The schedule officially terminates here; however, an extra week may be instated if any corrections are made and will be shown below.

No comments: